East Africa and the Indian Ocean

Electrical equipment — Tanzania

Electrical projects in Tanzania may serve mining, agricultural processing or port logistics. TANESCO and Tanzania Ports Authority publications provide distinct examples around Geita, Mtwara and Dar es Salaam. Transformation and distribution choices should follow the actual process, whether motor loads, auxiliaries, handling or storage. An equipment enquiry should identify the location and connection operator from the outset, because mainland Tanzania and Zanzibar require their respective network information.

Illustrative outdoor substation with a distribution transformer
Representative photograph · T Afrik Energy Solutions

Documented voltage levels

11 / 33 kV

Network counterpart

TANESCO — Tanzania Electric Supply Company Limited (mainland)

Networks and equipment class selection

EWURA’s FY2023/24 regulatory report identifies 11 and 33 kV MV levels within TANESCO’s distribution activities, providing recent evidence for mainland Tanzania. These figures do not establish an individual site’s connection voltage. For manufacturing or mining, identify the supply substation, available feeder, motor loads and protection interfaces. Zanzibar projects need their own operator and local network data; mainland specifications should not be assumed to settle a connection elsewhere.

[1]

Network voltage and equipment rating are different

The reference catalogue includes AIS and RMU classes 12, 24 and 36 kV, and AIS up to 40.5 kV. For nominal 30 or 33 kV networks, examine the 36 kV option against maximum voltage, insulation, current and fault constraints. A 24 kV class does not cover a nominal 30 kV network; 36 kV does not cover 66 kV. Cable U0/U/Um markings require separate validation.

Equipment

Ports, transit and the final site route

Tanzania Ports Authority identifies Dar es Salaam as the principal port and a gateway serving several landlocked neighbours. Its ports masterplan also describes Tanga and Mtwara; Mtwara’s context includes oil and gas project cargo and cashew exports. Port selection should follow the construction-site destination and the equipment’s handling requirements. Enquiries for northern Tanzania, Dar es Salaam or the Mtwara area should therefore specify the intended inland route and receiving arrangements.

[1][2]

Equipment to examine for your project

Configurations are adapted from the Imperium catalogue verified for this version. Confirm the actual reference, documents and availability in the offer; local approval is not automatic.

Illustrative lineup of air-insulated medium-voltage switchgear
· T Afrik Energy Solutions

Documented range

Air-insulated MV switchgear

Incomers, feeders and transformer protection: define board functions and configuration.

Published rated voltages: 12 / 24 / 36 / 40.5 kV.

Consultation requirements and documents

EWURA’s published distribution code covers connection requirements, metering, information exchange and network performance. Match it to the TANESCO specifications applicable to the project. The FY2022/23 audit report describes a 33 kV industrial connection for Geita Gold Mine with a 33/11 kV customer substation; it does not confirm present completion. For a comparable enquiry, provide upstream and downstream arrangements, motor capacities and maintenance conditions before defining the electrical equipment package.

[1]

Organise your technical dossier

Applications to assess

Possible applications, not completed T Afrik project references.

Geita-area mining installation: MV switchgear and cables, transformation and motor feeders suited to the process and studied connection.

IndustriesServices

Cashew processing around Mtwara: supplies for preparation lines, packaging equipment and auxiliary services.

IndustriesServices

Dar es Salaam port facility: MV/LV distribution for handling equipment, technical buildings and logistics services, with circuits allocated by function.

IndustriesServices

Frequently asked questions

Do the 11 and 33 kV levels automatically apply to a Zanzibar project?

The evidence here concerns TANESCO’s mainland activities. A Zanzibar project needs its own operator, connection point and local network data.

Does the Geita example establish 33 kV as the connection voltage for every mine?

It records one industrial arrangement in a dated report. Your mine’s voltage, available capacity and transformer configuration must be established for its particular connection.

Sources and verification scope

Sources checked on 9 October 2026

  1. EWURA — Electricity Sub-Sector Regulatory Performance Report FY2023/24
  2. EWURA — Tanzania Electricity Distribution Code
  3. Tanzania Ports Authority — Dar es Salaam Port
  4. Tanzania Ports Authority — Updated National Ports Masterplan executive summary
  5. TANESCO — Controller and Auditor General report FY2022/23
Explore the regional context

Agree shipment responsibilities

Specify weights, dimensions, port, final site, lifting and origin/transport documents. Packing, service and timing depend on the shipment. An Incoterm needs its named place and version; FCA or DAP are options to agree, not universal terms. Check ISPM 15 for regulated raw wood packaging.

[1][2]

Prepare procurement and logistics

Selecting equipment for your next project?

Tell us about your application, site and technical constraints to prepare a useful equipment consultation.

Request a quotation