An industrial supply in Senegal should connect the network configuration to operational needs, from refrigeration and production to pumping and site services. T Afrik Energy supports the specification of suitable MV/LV equipment. The uses below are illustrative applications.

Illustrative outdoor substation with a distribution transformer
Representative photograph · T Afrik Energy Solutions

Documented voltage levels

6.6 / 30 kV

Network counterpart

Senelec — Société nationale d’électricité du Sénégal

Networks and equipment class selection

Senelec’s 2024 annual report documents distribution at 6.6 and 30 kV, including 6.6 kV in Dakar and 30 kV within and outside Dakar. Check the specific feeder before specifying a substation, including for a capital-city site. Nominal voltage is only part of the connection interface: available capacity, fault currents and protection functions also matter. For sensitive loads or refrigeration equipment, describe continuity requirements and restart behaviour so that the LV distribution and any backup supply can be assessed together.

[1]

Network voltage and equipment rating are different

The reference catalogue includes AIS and RMU classes 12, 24 and 36 kV, and AIS up to 40.5 kV. For nominal 30 or 33 kV networks, examine the 36 kV option against maximum voltage, insulation, current and fault constraints. A 24 kV class does not cover a nominal 30 kV network; 36 kV does not cover 66 kV. Cable U0/U/Um markings require separate validation.

Equipment

Ports, transit and the final site route

The Port of Dakar is a maritime entry point to assess for deliveries to Senegal. Receiving in the Dakar area and transport to a regional installation need different onward arrangements. Before shipment, check the route for heavy equipment, site access and unloading facilities. Boards or switchgear intended for an existing building may need to be divided into transport sections according to doors, passages and available height. Equipment that can reach the port must also reach its final installation position, with receiving coordinated to the project programme.

[1]

Equipment to examine for your project

Configurations are adapted from the Imperium catalogue verified for this version. Confirm the actual reference, documents and availability in the offer; local approval is not automatic.

Illustrative three-phase cast-resin dry-type transformer
· T Afrik Energy Solutions

Documented range

Cast-resin dry-type transformers

A transformation option to assess against room conditions, ventilation and safety requirements.

Published range: 100–3,150 kVA; primary 3.3–36 kV.

Consultation requirements and documents

Identify the Senelec delivery point and the customer’s own distribution needs in the enquiry. The technical dossier can include layouts, the protection scheme, transformer data and LV board characteristics. ISO lists ASN as the national standards body; project and operator specifications must be checked for the actual connection. For a cold store or production line, state starting loads, priority circuits and restart sequences. These details support assessment of backup capacity and control interfaces, with equipment acceptance handled through the project’s technical review.

[1]

Organise your technical dossier

Applications to assess

Possible applications, not completed T Afrik project references.

Frequently asked questions

Is 30 kV the only documented MV level in Senegal?

Senelec’s 2024 report also records 6.6 kV, notably in Dakar. Always confirm the voltage of the relevant feeder.

How should backup power for refrigeration be specified?

Provide priority loads, starting currents and restart sequences. These inputs support assessment of the generator, source transfer and associated boards.

Sources and verification scope

Sources checked on 9 October 2026

  1. Senelec — Rapport annuel 2024
  2. Port autonome de Dakar — Infrastructures
  3. ISO — Annuaire des organismes nationaux de normalisation
Explore the regional context

Agree shipment responsibilities

Specify weights, dimensions, port, final site, lifting and origin/transport documents. Packing, service and timing depend on the shipment. An Incoterm needs its named place and version; FCA or DAP are options to agree, not universal terms. Check ISPM 15 for regulated raw wood packaging.

[1][2]

Prepare procurement and logistics

Selecting equipment for your next project?

Tell us about your application, site and technical constraints to prepare a useful equipment consultation.