East Africa and the Indian Ocean

Electrical equipment — Madagascar

Electrical projects in Madagascar cover textile production, port facilities and water-treatment installations. A factory in Antananarivo has different requirements from a technical building in Toamasina. Equipment selection should link the required capacity to the available network, the site environment and access from the port. Medium-voltage switchgear, transformers and low-voltage boards can then be specified around the actual installation, including existing equipment and the functions that require backup power.

Illustrative outdoor substation with a distribution transformer
Representative photograph · T Afrik Energy Solutions

Documented voltage levels

20 kV

Network counterpart

JIRAMA — Jiro sy Rano Malagasy

Networks and equipment class selection

JICA’s 2019 TaToM master plan describes 20 kV distribution in the Toamasina agglomeration and historic 5 kV feeders intended for conversion. It also distinguishes a 35 kV upstream link. This local evidence does not establish one voltage for Madagascar. For a JIRAMA connection, confirm the feeder’s present voltage, neutral arrangement and existing substation characteristics before selecting switchgear, protection settings and the transformer ratio.

[1][2]

Network voltage and equipment rating are different

The reference catalogue includes AIS and RMU classes 12, 24 and 36 kV, and AIS up to 40.5 kV. For nominal 30 or 33 kV networks, examine the 36 kV option against maximum voltage, insulation, current and fault constraints. A 24 kV class does not cover a nominal 30 kV network; 36 kV does not cover 66 kV. Cable U0/U/Um markings require separate validation.

Equipment

Ports, transit and the final site route

Toamasina port, managed by SPAT, is a gateway to assess for equipment entering the island. JICA identifies the city in 2026 as a major international logistics hub and supports renewal of its electrical infrastructure. Delivery planning should then follow the actual inland destination, whether a Toamasina facility, an Antananarivo factory or a more distant installation. Transformer weight, lifting arrangements and construction-site access help determine the appropriate final delivery plan.

[1]

Equipment to examine for your project

Configurations are adapted from the Imperium catalogue verified for this version. Confirm the actual reference, documents and availability in the offer; local approval is not automatic.

Illustrative lineup of air-insulated medium-voltage switchgear
· T Afrik Energy Solutions

Documented range

Air-insulated MV switchgear

Incomers, feeders and transformer protection: define board functions and configuration.

Published rated voltages: 12 / 24 / 36 / 40.5 kV.

Consultation requirements and documents

The November 2024 Mandroseza tender illustrates site-specific requirements. It describes existing 5.5 and 30 kV supplies at the water-treatment and pumping complex, with a new pumping station planned at 30 kV. Its specifications refer to Malagasy standards, JIRAMA requirements and selected UTE/NF standards where local references are absent. Submit the applicable tender specifications and connection diagram with your enquiry: these requirements depend on the installation and cannot be inferred solely from its country.

[1]

Organise your technical dossier

Applications to assess

Possible applications, not completed T Afrik project references.

Antananarivo textile production: low-voltage distribution for garment lines, with transformation and production-load separation suited to the building connection.

IndustriesServices

Toamasina technical building or warehouse: MV switchgear, transformation and LV boards sized for handling equipment and auxiliary loads.

IndustriesServices

Water treatment and pumping: motor supplies, coordinated protection and backup for essential functions, based on the station’s own network.

IndustriesServices

Frequently asked questions

Should equipment for Toamasina automatically be ordered at 35 kV?

The TaToM report distinguishes the 35 kV upstream link from 20 kV distribution. Confirm the current connection voltage and required equipment rating with JIRAMA for the particular site.

What information is needed for a pumping-station enquiry?

Provide connection voltage, motor power and starting method, essential functions and the operator’s specifications. The Mandroseza example shows why supplies must be checked for each installation.

Sources and verification scope

Sources checked on 9 October 2026

  1. JICA — TaToM master plan, Toamasina electricity infrastructure
  2. JICA — Improvement of Access to Electricity in Toamasina
  3. SPAT — Port of Toamasina
  4. EDBM — Investir dans le textile et l'habillement
  5. PAAEP — Mandroseza I pumping-station technical tender
Explore the regional context

Agree shipment responsibilities

Specify weights, dimensions, port, final site, lifting and origin/transport documents. Packing, service and timing depend on the shipment. An Incoterm needs its named place and version; FCA or DAP are options to agree, not universal terms. Check ISPM 15 for regulated raw wood packaging.

[1][2]

Prepare procurement and logistics

Selecting equipment for your next project?

Tell us about your application, site and technical constraints to prepare a useful equipment consultation.

Request a quotation