West Africa

Electrical equipment — Côte d’Ivoire

Equipment enquiries in Côte d’Ivoire can serve grid-connected factories, workshops, warehouses or pumping installations. T Afrik Energy develops proposals around the electrical interface and site requirements. The applications shown are illustrative uses, rather than project references.

Illustrative outdoor substation with a distribution transformer
Representative photograph · T Afrik Energy Solutions

Documented voltage levels

15 / 33 kV

Network counterpart

CIE — Compagnie Ivoirienne d’Électricité ; CI-ENERGIES

Networks and equipment class selection

ANARE-CI’s undated official page identifies distribution voltages of 15 and 33 kV. JICA’s May 2022 appraisal names CI-ENERGIES as the executing agency and CIE as the operator for the Taabo–Kossou–Bouaké project. These references provide context; they do not determine an individual connection voltage. For a factory or extension, confirm the delivery level, required capacity and protection coordination. Switchgear, transformers and cables should then be selected for the installation method, substation location and actual environmental conditions, including significant humidity exposure where relevant.

[1][2]

Network voltage and equipment rating are different

The reference catalogue includes AIS and RMU classes 12, 24 and 36 kV, and AIS up to 40.5 kV. For nominal 30 or 33 kV networks, examine the 36 kV option against maximum voltage, insulation, current and fault constraints. A 24 kV class does not cover a nominal 30 kV network; 36 kV does not cover 66 kV. Cable U0/U/Um markings require separate validation.

Equipment

Ports, transit and the final site route

The Port of Abidjan is a maritime entry point to assess for equipment destined for Côte d’Ivoire. Its 2024 annual report also documents hinterland transit. Plan around the actual receiving location: an Abidjan industrial site and an inland facility require different onward transport arrangements. Check handling requirements, load dimensions and access to the electrical room or substation area. Where equipment arrives in several lots, coordinated receiving can help make the switchgear, transformer and distribution boards available together for installation, subject to the project’s delivery schedule.

[1]

Equipment to examine for your project

Configurations are adapted from the Imperium catalogue verified for this version. Confirm the actual reference, documents and availability in the offer; local approval is not automatic.

Illustrative lineup of air-insulated medium-voltage switchgear
· T Afrik Energy Solutions

Documented range

Air-insulated MV switchgear

Incomers, feeders and transformer protection: define board functions and configuration.

Published rated voltages: 12 / 24 / 36 / 40.5 kV.

Illustrative three-phase cast-resin dry-type transformer
· T Afrik Energy Solutions

Documented range

Cast-resin dry-type transformers

A transformation option to assess against room conditions, ventilation and safety requirements.

Published range: 100–3,150 kVA; primary 3.3–36 kV.

Consultation requirements and documents

The specification should clearly define the interface between connection equipment and the customer’s internal distribution. Request single-line diagrams, protection data, substation layouts and relevant equipment test reports. ISO lists CODINORM as the national standards body; project and operator requirements should be confirmed for each supply. For a food processing facility, also describe cleaning conditions, humidity, ventilation and operational availability needs. These details support an explicit comparison between an outdoor substation, an indoor arrangement and a dry-type transformer, with acceptance managed through the project’s technical review.

[1][2]

Organise your technical dossier

Applications to assess

Possible applications, not completed T Afrik project references.

Frequently asked questions

Does Côte d’Ivoire use 15 or 33 kV distribution?

ANARE-CI documents both levels. The correct voltage depends on the planned connection and must be confirmed at the delivery point.

How should dry-type and oil transformers be compared?

Assess location, ventilation, the project’s fire requirements, maintenance and required capacity. The design consultant should validate the choice against the site specification.

Sources and verification scope

Sources checked on 9 October 2026

  1. ANARE-CI — Réseau de distribution
  2. JICA — Taabo-Kossou-Bouake Power Network Reinforcement Project, 2022
  3. Port autonome d’Abidjan — Rapport annuel 2024
  4. ISO — Annuaire des organismes nationaux de normalisation
Explore the regional context

Agree shipment responsibilities

Specify weights, dimensions, port, final site, lifting and origin/transport documents. Packing, service and timing depend on the shipment. An Incoterm needs its named place and version; FCA or DAP are options to agree, not universal terms. Check ISPM 15 for regulated raw wood packaging.

[1][2]

Prepare procurement and logistics