Documented range
Air-insulated MV switchgear
Incomers, feeders and transformer protection: define board functions and configuration.
Published rated voltages: 12 / 24 / 36 / 40.5 kV.
Central Africa
In Chad, cotton-processing projects, oil-production facilities and storage platforms require assessment of their actual supply arrangements. The World Bank’s corridor document links N’Djamena and Moundou to trade through Douala and describes the cotton and Doba-basin context. An enquiry may combine MV switchgear, transformers, LV boards and backup generation according to the installation. Available connection capacity and the organization of essential loads are central inputs when defining the equipment package.

Documented voltage levels
15 kVNetwork counterpart
TchadElec — Tchadienne d'Électricité (SNE in earlier project documents)Terms of reference published in March 2020 describe N’Djamena’s existing 15 kV MV network supplied from 90/15 kV substations. This concerns the capital rather than all Chadian networks. June 2026 project documents also plan a new 90/15 kV substation and MV/LV works there. The operator is now named TchadElec, created in July 2025; older documents use SNE. Confirm present voltage and interfaces with the relevant operator for each site.
The reference catalogue includes AIS and RMU classes 12, 24 and 36 kV, and AIS up to 40.5 kV. For nominal 30 or 33 kV networks, examine the 36 kV option against maximum voltage, insulation, current and fault constraints. A 24 kV class does not cover a nominal 30 kV network; 36 kV does not cover 66 kV. Cable U0/U/Um markings require separate validation.
EquipmentAs Chad is landlocked, the maritime gateway must connect to an explicit inland route. The World Bank’s 2022 project document describes the Douala–Ngaoundéré–Koutéré–Moundou–N’Djamena corridor, combining rail and road. An electrical-equipment delivery plan should identify transfer points, the receiving city and the final journey to the installation. Check availability of the selected transport arrangement and lifting facilities at each stage when organizing the actual shipment.
Configurations are adapted from the Imperium catalogue verified for this version. Confirm the actual reference, documents and availability in the offer; local approval is not automatic.

Documented range
Incomers, feeders and transformer protection: define board functions and configuration.
Published rated voltages: 12 / 24 / 36 / 40.5 kV.

Documented range
MV/LV transformation with liquid insulation and cooling; project-specific connections and siting.
Published range: 25–2,500 kVA; primary 3.3–36 kV. Agree actual model values.

Documented range
MV compartment, transformer and LV distribution in one assembly; coordinate civil and electrical interfaces.
Published MV classes: 12 / 24 / 36 kV; transformer 100–2,500 kVA depending on configuration.

Documented range
Distribute loads and priority circuits with an arrangement suited to operation and maintenance.
Fixed or withdrawable catalogue configurations; define assembly verification documentation.

Documented range
Prime or standby supply: assess loads, starting and siting before selecting capacity.
Published range: 0.5–3,550 kVA. Confirm the actual duty and offered rating.

Documented range
Copper or aluminium power connections; assess U0/U/Um, laying conditions and accessories together.
Published classes: 6/10 to 18/30 kV. Do not assume suitability for a 33 kV network without validation.
Distinguish an urban connection in N’Djamena, a mini-grid supply and an installation with its own generation. World Bank programmes separate these contexts, which need different equipment and operating interfaces. Provide updated TchadElec or site-operator requirements, the installation diagram and the loads that must remain supplied. For backup generation, specify motor loads, starting sequences and the division between essential circuits and other uses before defining capacity and switching arrangements.
Organise your technical dossierPossible applications, not completed T Afrik project references.
Moundou-area cotton processing: distribution boards and motor supplies for preparation and processing lines.
IndustriesServicesDoba-basin oil-production facility: transformation, auxiliary distribution and backup defined around the site’s functions.
IndustriesServicesN’Djamena storage platform: MV/LV distribution and identified essential circuits for preservation, handling and technical services.
IndustriesServicesEarlier references use Société Nationale d’Électricité. The official project-unit page describes TchadElec’s creation in July 2025. Identify the current operator and project contacts in the enquiry.
The 2020 terms of reference requested a study of a future transition, not proof of completion. The evidence presented records 15 kV and planned 90/15 kV works. Confirm the site’s current voltage.
Sources checked on 9 October 2026
Specify weights, dimensions, port, final site, lifting and origin/transport documents. Packing, service and timing depend on the shipment. An Incoterm needs its named place and version; FCA or DAP are options to agree, not universal terms. Check ISPM 15 for regulated raw wood packaging.
Prepare procurement and logisticsTell us about your application, site and technical constraints to prepare a useful equipment consultation.