Central Africa

Electrical equipment — Chad

In Chad, cotton-processing projects, oil-production facilities and storage platforms require assessment of their actual supply arrangements. The World Bank’s corridor document links N’Djamena and Moundou to trade through Douala and describes the cotton and Doba-basin context. An enquiry may combine MV switchgear, transformers, LV boards and backup generation according to the installation. Available connection capacity and the organization of essential loads are central inputs when defining the equipment package.

Illustrative outdoor substation with a distribution transformer
Representative photograph · T Afrik Energy Solutions

Documented voltage levels

15 kV

Network counterpart

TchadElec — Tchadienne d'Électricité (SNE in earlier project documents)

Networks and equipment class selection

Terms of reference published in March 2020 describe N’Djamena’s existing 15 kV MV network supplied from 90/15 kV substations. This concerns the capital rather than all Chadian networks. June 2026 project documents also plan a new 90/15 kV substation and MV/LV works there. The operator is now named TchadElec, created in July 2025; older documents use SNE. Confirm present voltage and interfaces with the relevant operator for each site.

[1]

Network voltage and equipment rating are different

The reference catalogue includes AIS and RMU classes 12, 24 and 36 kV, and AIS up to 40.5 kV. For nominal 30 or 33 kV networks, examine the 36 kV option against maximum voltage, insulation, current and fault constraints. A 24 kV class does not cover a nominal 30 kV network; 36 kV does not cover 66 kV. Cable U0/U/Um markings require separate validation.

Equipment

Ports, transit and the final site route

As Chad is landlocked, the maritime gateway must connect to an explicit inland route. The World Bank’s 2022 project document describes the Douala–Ngaoundéré–Koutéré–Moundou–N’Djamena corridor, combining rail and road. An electrical-equipment delivery plan should identify transfer points, the receiving city and the final journey to the installation. Check availability of the selected transport arrangement and lifting facilities at each stage when organizing the actual shipment.

[1]

Equipment to examine for your project

Configurations are adapted from the Imperium catalogue verified for this version. Confirm the actual reference, documents and availability in the offer; local approval is not automatic.

Illustrative lineup of air-insulated medium-voltage switchgear
· T Afrik Energy Solutions

Documented range

Air-insulated MV switchgear

Incomers, feeders and transformer protection: define board functions and configuration.

Published rated voltages: 12 / 24 / 36 / 40.5 kV.

Consultation requirements and documents

Distinguish an urban connection in N’Djamena, a mini-grid supply and an installation with its own generation. World Bank programmes separate these contexts, which need different equipment and operating interfaces. Provide updated TchadElec or site-operator requirements, the installation diagram and the loads that must remain supplied. For backup generation, specify motor loads, starting sequences and the division between essential circuits and other uses before defining capacity and switching arrangements.

[1][2]

Organise your technical dossier

Applications to assess

Possible applications, not completed T Afrik project references.

Moundou-area cotton processing: distribution boards and motor supplies for preparation and processing lines.

IndustriesServices

Doba-basin oil-production facility: transformation, auxiliary distribution and backup defined around the site’s functions.

IndustriesServices

N’Djamena storage platform: MV/LV distribution and identified essential circuits for preservation, handling and technical services.

IndustriesServices

Frequently asked questions

Why do some documents name SNE while others name TchadElec?

Earlier references use Société Nationale d’Électricité. The official project-unit page describes TchadElec’s creation in July 2025. Identify the current operator and project contacts in the enquiry.

Can N’Djamena’s transition to 30 kV be treated as completed?

The 2020 terms of reference requested a study of a future transition, not proof of completion. The evidence presented records 15 kV and planned 90/15 kV works. Confirm the site’s current voltage.

Sources and verification scope

Sources checked on 9 October 2026

  1. SWEDD/Chad — SNE N'Djamena distribution-network engineering terms of reference
  2. CEP-TchadElec — Qui sommes-nous
  3. World Bank — Chad Scales Up Its Access to Energy
  4. World Bank — Cameroon–Chad Transport Corridor project appraisal
  5. CEP-TchadElec — N'Djamena PAAET/PIRECT resettlement plan
Explore the regional context

Agree shipment responsibilities

Specify weights, dimensions, port, final site, lifting and origin/transport documents. Packing, service and timing depend on the shipment. An Incoterm needs its named place and version; FCA or DAP are options to agree, not universal terms. Check ISPM 15 for regulated raw wood packaging.

[1][2]

Prepare procurement and logistics

Selecting equipment for your next project?

Tell us about your application, site and technical constraints to prepare a useful equipment consultation.

Request a quotation