Industrial electrical equipment for Burkina Faso should be assessed together with its connection and inland transport route. T Afrik Energy supports enquiries for substations, distribution and motor supplies. The sectors below illustrate potential applications.

Illustrative outdoor substation with a distribution transformer
Representative photograph · T Afrik Energy Solutions

Documented voltage levels

15 / 20 / 33 / 34.5 kV

Network counterpart

SONABEL — Société nationale d’électricité du Burkina

Networks and equipment class selection

The ministry’s January 2026 SOLEER notice describes 15, 20, 33 and 34.5 kV distribution in the network supervised by SONABEL. This provisional document provides network context; the four values are not interchangeable or applicable to every delivery point. Confirm site voltage, neutral arrangements and fault levels before selecting switchgear, transformers or cables. For motor installations or several workshops, also provide load profiles and simultaneous starts. Heat, dust exposure and maintenance arrangements should inform the substation layout and equipment access.

[1]

Network voltage and equipment rating are different

The reference catalogue includes AIS and RMU classes 12, 24 and 36 kV, and AIS up to 40.5 kV. For nominal 30 or 33 kV networks, examine the 36 kV option against maximum voltage, insulation, current and fault constraints. A 24 kV class does not cover a nominal 30 kV network; 36 kV does not cover 66 kV. Cable U0/U/Um markings require separate validation.

Equipment

Ports, transit and the final site route

Burkina Faso requires inland transport after equipment arrives by sea. The Port of Abidjan’s 2024 report documents transit to the country, supporting assessment of that entry point. The chosen route must still be checked for each shipment and final destination. State whether receiving will take place in Ouagadougou, Bobo-Dioulasso or directly at another site. Compact substation dimensions, transformer weight and access to the receiving platform may require different transport arrangements. The carrier and site team should assess the final journey and unloading requirements together.

[1]

Equipment to examine for your project

Configurations are adapted from the Imperium catalogue verified for this version. Confirm the actual reference, documents and availability in the offer; local approval is not automatic.

Illustrative lineup of air-insulated medium-voltage switchgear
· T Afrik Energy Solutions

Documented range

Air-insulated MV switchgear

Incomers, feeders and transformer protection: define board functions and configuration.

Published rated voltages: 12 / 24 / 36 / 40.5 kV.

Consultation requirements and documents

Request a proposal based on the actual SONABEL connection or private installation. The technical dossier can compare switchgear functions, transformer losses, insulation levels and useful monitoring devices. ISO identifies ABNORM as the national standards body; the specification should define expected technical references and required reviews. For production workshops, provide operating cycles and controlled shutdown needs. At remote sites, spares availability, component access and local maintenance capabilities become practical comparison criteria. Proposed equipment should be reviewed against these requirements before the supply configuration is finalised.

[1][2]

Organise your technical dossier

Applications to assess

Possible applications, not completed T Afrik project references.

Frequently asked questions

Why are several distribution voltages listed?

The January 2026 SOLEER notice documents 15, 20, 33 and 34.5 kV in the network supervised by SONABEL. The actual connection point determines the equipment voltage.

Can Abidjan be assessed as an entry point for Burkina Faso?

The port’s 2024 report documents this transit. The route, crossing conditions and onward transport to site must be confirmed for the shipment.

Sources and verification scope

Sources checked on 9 October 2026

  1. Ministère de l’Énergie du Burkina Faso — NIES du Centre national de conduite, janvier 2026
  2. Port autonome d’Abidjan — Rapport annuel 2024
  3. ISO — Annuaire des organismes nationaux de normalisation
Explore the regional context

Agree shipment responsibilities

Specify weights, dimensions, port, final site, lifting and origin/transport documents. Packing, service and timing depend on the shipment. An Incoterm needs its named place and version; FCA or DAP are options to agree, not universal terms. Check ISPM 15 for regulated raw wood packaging.

[1][2]

Prepare procurement and logistics

Selecting equipment for your next project?

Tell us about your application, site and technical constraints to prepare a useful equipment consultation.