North Africa

Electrical equipment — Tunisia

With a company-confirmed presence in Tunisia and Türkiye, T Afrik can prepare an enquiry connecting local requirements with industrial sourcing. For a customer substation, factory extension or service supply, the offer starts with the available network and connection dossier. Technical discussions, manufacturer selection and commercial documentation need to meet the project's requirements.

Illustrative outdoor substation with a distribution transformer
Representative photograph · T Afrik Energy Solutions

Documented voltage levels

10 / 15 / 17 / 30 kV

Network counterpart

STEG — Société Tunisienne de l'Électricité et du Gaz

Networks and equipment class selection

STEG specifies a three-phase MV supply of 30 kV ±7%, with 15 kV in some southern towns and 10 kV in some northern and central towns; it also lists single-phase 17 kV in isolated rural areas. These figures describe the network, rather than every device's equipment rating. Equipment rated 36 kV can be considered for a 30 kV supply, but its suitability needs verification in the STEG dossier: insulation, current, short-circuit withstand, protection, connections and substation arrangement. The voltage rating alone does not constitute approval. The district confirms network characteristics at the project address and the substation's location and orientation before the study and connection conditions are finalized.

[1]

Network voltage and equipment rating are different

The reference catalogue includes AIS and RMU classes 12, 24 and 36 kV, and AIS up to 40.5 kV. For nominal 30 or 33 kV networks, examine the 36 kV option against maximum voltage, insulation, current and fault constraints. A 24 kV class does not cover a nominal 30 kV network; 36 kV does not cover 66 kV. Cable U0/U/Um markings require separate validation.

Equipment

Ports, transit and the final site route

Radès, Sfax and Bizerte-Menzel Bourguiba are commercial ports documented by OMMP. Radès is mainly associated with containers and rolling units; Sfax is multipurpose; Bizerte serves an industrial hinterland with a substantial bulk-cargo component. The appropriate port therefore depends on equipment packaging and final destination. A pallet of MV equipment, a cable drum and a heavy transformer have different handling needs. The enquiry identifies dimensions, mass, site access and unloading responsibility. For a shipment from Türkiye, confirm the selected route, intermediate calls, carrier availability and import formalities. A standard sea-transit estimate cannot replace those checks.

[1][2]

Equipment to examine for your project

Configurations are adapted from the Imperium catalogue verified for this version. Confirm the actual reference, documents and availability in the offer; local approval is not automatic.

Illustrative lineup of air-insulated medium-voltage switchgear
· T Afrik Energy Solutions

Documented range

Air-insulated MV switchgear

Incomers, feeders and transformer protection: define board functions and configuration.

Published rated voltages: 12 / 24 / 36 / 40.5 kV.

Illustrative three-phase cast-resin dry-type transformer
· T Afrik Energy Solutions

Documented range

Cast-resin dry-type transformers

A transformation option to assess against room conditions, ventilation and safety requirements.

Published range: 100–3,150 kVA; primary 3.3–36 kV.

Consultation requirements and documents

For an MV customer substation, STEG describes a technical dossier submitted by the customer's chosen approved contractor, including drawings and an equipment description, followed by the supply-line study and approval procedures. Equipment selection should follow that project dossier. STEG's testing centre performs tests and technical acceptance against contractual references. INNORPI separately performs national standards and product-certification functions; these do not replace STEG's project review. Before ordering, clarify the technical data, drawings, test evidence and approvals actually required. An IEC reference, manufacturer certificate or 36 kV equipment rating alone does not establish acceptance of the assembly.

[1][2][3][4]

Organise your technical dossier

Türkiye–Tunisia: origin and customs treatment

The Türkiye–Tunisia agreement provides opportunities for preferential treatment subject to product classification and origin conditions. An admissible EUR.1 certificate or origin declaration establishes origin; it does not by itself guarantee exemption from all duties and taxes. Customs published circular 009/2026 on revised PEM origin rules on 16 February 2026. The 2024 Finance Law also introduced specific tariff measures for certain Turkish-origin products. Before shipment, have the importer and customs broker confirm the tariff code, origin rule, applicable evidence and duties on the declaration date.

[1][2][3][4]

Applications to assess

Possible applications, not completed T Afrik project references.

Factory customer substation: define 30/0.4 kV or the local alternative, switchgear and LV board from contracted capacity and the STEG dossier.

IndustriesServices

Agricultural pumping in a rural area: confirm available three-phase or single-phase supply, motor starting and cable protection.

IndustriesServices

Solar self-generation at an industrial site: study MV interfaces, protection and metering under the applicable connection procedure.

IndustriesServices

Frequently asked questions

Why check 36 kV equipment for a STEG 30 kV network?

30 kV is the nominal supply voltage; 36 kV is an equipment voltage rating. The other characteristics and substation dossier still require checking with STEG. Some areas use 10 or 15 kV, while isolated rural areas may use single-phase 17 kV.

What lead time should be allowed for delivery from Türkiye?

Lead time is confirmed after equipment selection, availability or manufacturing, port and carrier route, customs documents and inland delivery are defined. The schedule needs to distinguish these stages; no fixed duration is stated before they are confirmed.

Which customs documents should be prepared?

Prepare the invoice, packing list and transport document, followed by the origin evidence needed for the requested treatment, such as EUR.1 where applicable. The importer and customs broker confirm classification, current rules and any additional product-specific documents.

Sources and verification scope

Sources checked on 9 October 2026

  1. STEG — Nouveau client MT/MP
  2. STEG — Activités du centre essais et mesures
  3. INNORPI — Certification des produits
  4. OMMP — Rapport d'activité 2024
  5. OMMP — Rapport annuel 2023: commercial port functions
  6. Tunisian Customs — Conventions bilatérales, Türkiye section
  7. Tunisian Customs — Circular 009/2026 and revised PEM origin convention
  8. Tunisian Customs — Official bulletin, 2026 circulars
  9. Tunisian Ministry of Finance — Finance Law 2024, Article 44
  10. APIP — Public works specification for a 30 kV / 36 kV substation
  11. STEG — Raccordement des centrales EnR assujetties à une autorisation
Explore the regional context

Agree shipment responsibilities

Specify weights, dimensions, port, final site, lifting and origin/transport documents. Packing, service and timing depend on the shipment. An Incoterm needs its named place and version; FCA or DAP are options to agree, not universal terms. Check ISPM 15 for regulated raw wood packaging.